After following these 6 steps, the outline of the M&E plan should look something like this:

  • Introduction to program. ​Program goals and objectives.
  • ​​Indicators. Table with data sources, collection timing, and staff member responsible.
  • Roles and Responsibilities.
  • ​Reporting.
  • Dissemination plan.

What is a Mel plan?

The Project MEL Plan is a critical tool that the Project Manager and Project Team use to monitor, evaluate, and learn from implementation. The main purpose of the MEL Plan is to document how and what information will be gathered, analyzed, and used to inform adaptive project management and review progress.

What are the goals for this M&E plan?

The purpose of an M&E plan is to encourage project or programme staff to think clearly about what they intend doing in the way of M&E before implementation of a project or programme begins, and to ensure those plans are adequately documented.

What is the difference between M&E plan and M&E framework?

An M&E framework is one part of an M&E plan, which describes how the whole M&E system for the program or organisation works. If you need to write a full M&E plan for one or more projects see our M&E plan template.

What is M&E strategy?

A monitoring and evaluation strategy enables at a high level, an effective strategy to allow for the ongoing review, analysis and understanding of the performance of a project (or program) through its life.

What are the tools of M&E?

Tools or M&E Planning

  • Theory of Change.
  • Logical Framework (Logframe)
  • Monitoring and Evaluation Plan.
  • Statistics – Open Datasets.
  • System Data.
  • Surveys.
  • Interviews and Focus Groups.
  • Sample Size.

What is amelp?

The Activity Monitoring, Evaluation, and Learning Plan (AMELP) is a strategic planning and performance monitoring and evaluation tool. It will be updated regularly based on results and lessons learned and shared with USAID throughout the life of activity.

What is project logframe?

A log frame is a tool for improving the planning, implementation, management, monitor- ing and evaluation of projects. The log frame is a way of structuring the main elements in a project and highlighting the logical linkages between them.

What is an M & E framework?

For many organisations, an M&E framework is a table that describes the indicators that are used to measure whether the program is a success. In other organisations the whole M&E plan is called an M&E framework (as if things weren’t confusing enough!).

What are the four monitoring strategies?

1.4 The monitoring and evaluation strategy is organized into four main streams of work: results monitoring, grant monitoring, evaluation, and dissemination and learning.